TAOUIMA BYPASS ROUTE

Accessibility and mobility

The 3 km long Taouima bypass will represent a direct access from the Bouareg track (VBO1) to the site of the lagoon of Marchica.

Consistance d’aménagement

The 3 main parts of the project are:

  • The 3 km long Taouima bypass, will constitute, after the completion of the project a direct access from the Bouareg track (VBO1) to the site of the Marchica lagoon.
  • The connecting route with the VN2 lane along the Nador waterfront.
  • The construction of the engineering structure on Oued Caballo.

The 3 km long Taouima bypass will represent a direct access from the Bouareg track (VBO1) to the site of the lagoon of Marchica.